The Reno Guide
Independent
About
Renovation basics · 2026

From bare studs
to move-in in 8 stages

Most renovation stress isn't about taste. It's about not knowing what should happen next, what it should cost, and who is responsible when it doesn't. This guide breaks a whole-house remodel into eight stages you can actually check.

8Stages
3–5Months typical
12Walkthrough checks
02

The order things happen

Get the sequence wrong and you pay twice. This is the rhythm of a typical single-family remodel.

Weeks 1–2
Scope, budget, and reality check
Decide refresh vs. remodel vs. addition before anyone draws anything.
Weeks 2–6
Design and permit drawings
A permit set is not a mood board. Plan review can take 2–6 weeks on its own.
Weeks 6–8
Permits, demo, site protection
Pre-1978 homes need lead-safe practices. Dust walls go up before the sledgehammer.
Weeks 8–13
Structural work and rough-in
Framing, electrical, plumbing, HVAC. Then the rough-in inspection, before walls close.
Weeks 13–15
Insulation, drywall, waterproofing
This is where a house stops looking like a construction site — and where shortcuts hide.
Weeks 15–18
Tile, flooring, trim
Layout decisions are permanent here. Check the tile layout before a single bag is mixed.
Weeks 18–19
Paint and finishes
Primer plus two coats. Temperature and humidity matter more than the brand.
Weeks 19–21
Fixtures, punch list, final inspection
Hold 5–10% of the contract until the punch list is signed off.
1,200 sq ft ≈ 3 months 2,500 sq ft ≈ 4–5 months Pre-1940 +20–30%
03

Where the money goes

A 1,500 sq ft mid-range remodel in full, about $180 per sq ft before surprises.

Cabinets & countertops~$54k
Drywall, framing & demo~$49k
Flooring & tile~$30k
Electrical~$24k
Plumbing~$22k
Paint & trim~$24k

Bars show hard costs, roughly three quarters of the total. The rest is design, permits, and the contingency you should never announce as available.

These are broad national ranges, not quotes. Labor alone varies by 30–50% between markets, and a coastal metro can double a rural number on the same scope.

04

Common questions

How long does a whole-house remodel take?

For a 1,200–1,500 sq ft house with no structural surprises, plan on 3–4 months of construction after permits are issued. Larger homes, additions, and anything touching load-bearing walls run 5–7 months. The variable is rarely how fast people work — it is how long materials and decisions take.

Do I actually need a permit?

Cosmetic work — paint, flooring over an existing subfloor, swapping a faucet — usually does not. Structural changes, new or relocated plumbing and electrical circuits, HVAC work, gas lines, and anything that changes egress almost always do. Rules are set locally, so call your building department and describe the job in one sentence. Unpermitted work becomes a problem when you sell.

General contractor, design-build, or owner-builder?

A general contractor (GC) coordinates trades and holds the schedule; you pay 15–25% for that. Owner-builder saves that fee but you become the scheduler, the inspector's contact, and the person the subs call at 7 a.m. It works if you have genuine availability, not just enthusiasm.

What is a realistic contingency?

15–20% of the contract, held separately and not mentioned as available. Once a crew knows there is a cushion, the scope tends to find it. On pre-1978 homes or anything with original plumbing, 25% is not pessimistic.

Is it cheaper to move?

Sometimes. If the layout already works and you mainly want a better kitchen and bath, remodeling usually beats moving once you net out commissions (5–6%), closing costs, and moving. If you need a different layout, a different school district, or more square footage, an addition is often the more expensive path.